Home

About us

Crane hire

Piling & Civil

Precast

Heavy haulage

Building relocation

Contact us

Precast

About precast manufacturing

Prestressed flooring

Architectural precast

Civil precast

Health & safety
and quality assurance

Photo gallery

Past projects

Bernard Street

Prinout Graphics

Selwyn Aquatic Centre

St Thomas of Canterbury College

University of Canterbury

Wilmers Road Pump Station

Job vacancies

 
 
 
 
 

Past projects

University of Canterbury

2012 – Ilam

BRIEF

Due to earthquake damage, the hydraulics laboratory water tower structure at the Canterbury university needed to be replaced.

Smith Crane and Construction was contracted to manufacture replacement cylindrical hollow tower sections and also carry out remedial works to the original header tank.

To allow the header tank to be reused in the new structure, we removed a section of the base ring and cast a new profile to match the seating details of the new tower sections. Once erected the separate sections of the header tank and tower units were connected together using a post tensioning system.