Past projectsDemolition – CDHB Hospital Chimney2012 – Christchurch Hospital BRIEF
Systematic deconstruction of the 67 meter high chimney at Christchurch Hospital for the Christchurch District Health Board.
The 4 meter diameter concrete and brick internal lined chimney was cut into 4 meter high sections and lifted down for disposal.
The works were completed whilst keeping the existing boiler house operational 24 hours per day.
|