Home

About us

Crane hire

Piling & Civil

Precast

Heavy haulage

Building relocation

Contact us

Piling & Civil

About piling & civil engineering

Piling & foundations

Demolition

Bridges & structures

Marine

Health & safety
and quality assurance

Photo gallery

Past projects

Demolition – CDHB Hospital Chimney

Demolition – Clarendon Tower

Foundation – Windfarm

Marine – Milford Sound fresh water basin reserve

Piling – Screw piles

Retaining Walls – Lyttelton

Retaining Walls – Mt Pleasant Gabian Basket

Structure – Bridge No. 3

Structure – Bridge No. 41

Structure – Bridge No. 89

Structure – Private Driveway

Structure – Residential bridge

Structure – Wingatui Bridge

Plant for hire

 
 
 
 
 

Past projects

Demolition – CDHB Hospital Chimney

2012 – Christchurch Hospital

BRIEF

Systematic deconstruction of the 67 meter high chimney at Christchurch Hospital for the Christchurch District Health Board.

The 4 meter diameter concrete and brick internal lined chimney was cut into 4 meter high sections and lifted down for disposal.

The works were completed whilst keeping the existing boiler house operational 24 hours per day.