Past projectsStructure – Bridge No. 412012 – Bridge 41, Midland Line, Cass River BRIEF
Replacements of Bridge 41 midland lane for Kiwirail at Cass, just east of Arthurs Pass.
This work was carried out in a very isolated location where we constructed a camp for up to 10 employees during the construction phase.
Works included:
• Installation of six 1200mm diameter piles.
• Pile caps and abutments
• Precast deck unit manufactured on site weighing 120 ton each.
• Post tensioning
• Installation of deck units.
• Earthwork and approaches
• Substantial river protection works
|