Home

About us

Crane hire

Piling & Civil

Precast

Heavy haulage

Building relocation

Contact us

Piling & Civil

About piling & civil engineering

Piling & foundations

Demolition

Bridges & structures

Marine

Health & safety
and quality assurance

Photo gallery

Past projects

Demolition – CDHB Hospital Chimney

Demolition – Clarendon Tower

Foundation – Windfarm

Marine – Milford Sound fresh water basin reserve

Piling – Screw piles

Retaining Walls – Lyttelton

Retaining Walls – Mt Pleasant Gabian Basket

Structure – Bridge No. 3

Structure – Bridge No. 41

Structure – Bridge No. 89

Structure – Private Driveway

Structure – Residential bridge

Structure – Wingatui Bridge

Plant for hire

 
 
 
 
 

Past projects

Structure – Bridge No. 3

2012 – Heathcote Christchurch

BRIEF

Replacement of Bridge 3 Main South Line following substantial damage after the February 2011 Canterbury earthquake. This work was carried out as an Early Contractor Involvement (ECI) contract with Kiwirail and Novare design.

The works for this job included:

- Bored installation of 1.2 meter diameter piles with 600mm driven piles within concrete abutment

- Permanent sheet piling

- Precast deck units manufacture and installation

- Post tensioning

- Earthworks and drainage