Past projectsStructure – Wingatui Bridge2010 – Mosgiel, Dunedin BRIEF
Removal of existing timber bridge and construct new 48 meter long hollowcore concrete bridge included:
• Piling
• Abutments
• Central Pier
• Hollowcore Manufacture and Installation
• Guard railing
• Approaches
• 600mm diameter water main
|